Leonardo seamless chair - Charcoal grey
This chair is simply designed with an upholstered backrest and seating surface and four wooden legs. Despite the simple design, the stitch line of the seating surface is a single stroke.
While the rear legs rise sideways in a straight line, the back support leans gently backward against the straight line rising from the legs and drawing a line that links naturally for a com- fortable fit. In addition, the seating frame, is chamfered so that the legs and seating surface connect in a gentle curve.
SPECIFICATIONS
Wood: Beech
Finish: Charcoal grey
Width: 454 mm
Depth: 545 mm
Height: 808 mm
Seat Height: 435 mm
Upholstery material in product image: Riff 06/77, 12/80 (F1)
Prices vary depending on fabric/leather rank.
Please press a rank button and fill in the fabric/leather number.
Note 1: The colors of materials may vary slightly depending on your device's screen.
Note 2: Please check here the list of the countries that we are not selling at this moment on this e-commerce site.
HANDLING PRECAUTIONS
VARIATION OF THIS CHAIR
If you want any different material than specified on this product page, please contact us.
This product can be made in the following variations.
BEECH | |||
Soap | |||
Natural White | Snow White | Medium Grey | Charcoal Grey |
WALNUT | |||
Beeswax | |||
FABRIC | |||
LEATHER |
Please use the link below for variations of all items.
MATERIALS AND CARE
SHIPPING DUTIES AND TIME -Furniture-
The tax amount, VAT rate, and duty rate vary from 5% to 20%, depending on the country.
Payment of duties
Import VAT, and other taxes associated with the importation of the purchased product will be communicated to you by the courier at customs clearance via email or on your registered telephone number. Depending on where you live, you may have to pay at the time of delivery to your address.
Estimated delivery time
All products are order-made and carefully processed, assembled, and finished by our craftsmen in Japan.
Production time for Time & Style products will take up from 6 weeks to 12 weeks.
Production time for the Peter Zumthor collection takes three months.
We ship our products from japan.
For large quantities we will contact you.
For any further information, please contact us.
Choose options